Project case study

    Knostrop anaerobic digestion facility

     
    Balmoral Tanks case study

    One of the largest renewable energy projects ever undertaken in the UK, Balmoral Tanks products help process municipal waste and sewage through Yorkshire Water’s £72m Knostrop (Leeds) anaerobic digestion facility.

    48,000 tonnes of dry waste will be processed every year generating up to 100mw hours of electricity per day.

    Application Renewable energy from waste
    Tank types efusion®
    No of tanks
    16
    Total capacity
    4 x 28,500m3 Reinforced concrete anaerobic digesters plus 12 supporting efusion process tanks, associated pipework, mechanical and installation infrastructure
    Scope of work
    Design, manufacture, 12-month installation

    Balmoral Tanks Ltd
    A Balmoral Group company
    Contact us | Locations
    Reg No. SC300656

    Potable/non-potable and firefighting water storage
    +44 (0)208 665 4100 | Email us

    Anaerobic digestion, WWT and processing storage
    +44 (0)1226 340370 | Email us

    Land based aquaculture
    +44 (0)1226 340370 | Email us

    Technical services
    +44 (0)1443 235170 | Email us

    © 2015 Your Company. All Rights Reserved. Designed By JoomShaper

    Search