Project case study

    Brewery AD effluent treatment project

     
    Balmoral Tanks case study

    What was installed:

    Buffer tank Ø9.4m x 16.4m high. Epoxy coated tank with a 20° conical roof structure. Net capacity, including freeboard, 1057m3.

    Biobed tank Ø7.8m x 18m high. Stainless steel with externally beamed stainless steel roof structure. 70mbar test pressure. Net capacity, including freeboard, 808m3.

    Flash aeration tank Ø7.8m x 8.1m high. Epoxy coated with 20° conical roof structure. Net capacity, including freeboard, 337m3.

    Conditioning tank Ø1.5m x 18m high. Stainless steel tank with externally beamed stainless steel roof structure. 70mbar test pressure. Net capacity, including freeboard, 30m3.

    The conditioning tank is a company ‘first’ it being the smallest diameter/highest tank we have ever designed, fabricated and installed.

    Water testing was carried out by the client while gas and air tests to pressures given above were tested by Balmoral.

    Application Anaerobic effluent treatment plant
    Tank types efusion™ and stainless steel
    No of tanks
    4
    Total capacity
    2232m3
    Scope of work
    Design, supply, install, test

    Balmoral Tanks Ltd
    A Balmoral Group company
    Contact us | Locations
    Reg No. SC300656

    Potable/non-potable and firefighting water storage
    +44 (0)208 665 4100 | Email us

    Anaerobic digestion, WWT and processing storage
    +44 (0)1226 340370 | Email us

    Land based aquaculture
    +44 (0)1226 340370 | Email us

    Technical services
    +44 (0)1443 235170 | Email us

    © 2015 Your Company. All Rights Reserved. Designed By JoomShaper

    Search